Document Type : Research Paper

Authors

1 Assistant Professor, Soil Conservation and Watershed Management Research Department, Fars Agricultural and Natural Resources Research and Education Center, Agricultural Research, Education and Extension Organization (AREEO), Shiraz, Iran

2 Assistant Professor, Soil Conservation and Watershed Management Research Institute, Agricultural Research, Education and Extension Organization (AREEO), Tehran, Iran.

3 Associate Professor, Soil Conservation and Watershed Management Research Institute, Agricultural Research, Education and Extension Organization (AREEO), Tehran, Iran.

4 M.Sc., Department of Natural Resources and Watershed Management, Fars Province, Shiraz, Iran.

Abstract

Implementation of watershed management projects without the participation of people has not been very successful. Therefore, prioritizing indices and sub-indicators affecting their poor participation is an important step in managing of watersheds and it can lead to taking measures to eliminate barriers to participation and maximum participation of stakeholder in planning. Therefore, in this research the priority of investigation of stakeholders in prioritizing factors affecting their poor participation in watershed management projects in Morad Abad watershed in Meymand, west of Fars province so after completing 72 questionnaires from the head of the household using T test and Friedman nonparametric test were done. The results showed that from the views of stakeholder, the indicators such as "economic", "educational-extensional", "design-executive" and "social" were the maximum and minimum priorities of poor participation of stakeholders in watershed projects in this watershed. Also, the most important sub-indicators on poor participation of stakeholders in watershed projects in this watershed are "low income residents of the watershed," "lack of local power in implementing projects (job creation)", "ignoring income for stakeholders as a direct incentive to implement of watershed management projects ", and" low level of literacy and awareness". Accordingly, the range of average ratings varies from 6.93 to 10.25, so that the sub-indicator "low income residents of the basin" with an average rating of 10.25 has the highest relative priority and "late watershed project efficiency" with an average of 6.93 had the least relative priority in poor participation of stakeholders in watershed projects in this watershed.

Keywords